Considerate All work is to be carried out with positive consideration to the needs of traders and businesses, site personnel and visitors, and the general public. Special attention is to be given to the needs of those with sight, hearing and mobility difficulties. Environment Be aware of the environmental impact of your site and minimise as far as possible the effects of noise light and air pollution. Efforts should be made to select and use local resources wherever possible. Attention should be paid to waste management. Reuse and recycle materials where possible. Cleanliness The working site is to be kept clean and in good order at all times. Site facilities, offices, toilets and drying rooms should always be maintained to a good standard. Surplus materials and rubbish should not be allowed to accumulate on the site or spill over into the surroundings. Dirt and dust from construction operations should be kept to a minimum. Good Neighbour General information regarding the Scheme should be provided for all neighbours affected by the work. Full and regular communication with neighbours, including adjacent residents, traders and businesses, regarding programming and site activities should be maintained from pre-start to completion. Respectful Respectable and safe standards of dress should be maintained at all times. Lewd or derogatory behaviour and language should not be tolerated under threat of severe disciplinary action. Pride in the management and appearance of the site and the surrounding environment is to be shown at all times. Operatives should be instructed in dealing with the general public. Safe Construction operations and site vehicle movements are to be carried out with care and consideration for the safety of site personnel, visitors and the general public. No building activity should be a security risk to others. Responsible Ensure that everyone associated with the site understands implements and complies with this code. Accountable The Considerate Constructors Scheme poster is to be displayed where clearly visible to the general public. A site’s contact details should be obvious to anyone affected by its activities.
|